Our Landywood Landscapes team recently completed a full dig off and slabbing job in Birmingham for Morro Partnerships.
The work began with the careful removal of existing fence panels and posts to create access. We then constructed a temporary ramp, allowing our micro digger and dumper to reach the site efficiently and safely.
Once access was in place, the team carried out a complete dig off, before laying a suitable membrane and a compacted stone sub-base to ensure strength and stability. A mortar bed was then prepared for precision laying of 140 new slabs, delivering a clean and durable finish.
The result is a high-quality paved area, installed to last, showcasing the attention to detail and teamwork that defines Landywood Landscapes.
See the whole process on our social media platform.